1 Please place professional isolation facilities before installation for ensuring the safety of workers.
2 The road surface should be level and even, any repair to the surface should be conducted prior to installation.
3 Ensure the road is cleaned of all debris.
4 Puring the appropriate amount of glue or screws to hold the road stud and locate the road stud so that its lighted side is facing towards to drivers.
5 Inspect studs 2 hours after installation and re-adjust if there has any movement.
6 Inspect after 4 hours and check that all studs are firmly located and show no signs of movement.