1 Please place professional isolation facilities before installation for ensuring the safety of workers.
2 The road surface should be level and even ,any repair to the surface should be conducted prior to installation.
3 The road stud requires a bore hole.
4 Ensure the hole is cleaned of all debris.
5 Puring the appropriate amount of glue or screws to hold the road stud and locate the road stud so that its lighted side is facing towards to drivers.
6 Inspect studs 2 hours after installation and re-adjust if there has any movement.
7 Inspect after 4 hours and check that all studs are firmly located and show no signs of movement.